Skip to content

Roofing · Roof Replacement

Roof replacement, taken back to the boards

A full tear-off, a deck somebody actually looked at, and a written quote after a free inspection — not a price off a satellite image.

  • Free, no-obligation inspection
  • No payments until completion
  • Industry-leading warranties

Get Your Free Estimate

60 seconds · no obligation · same-day callback

Your info is safe. We never sell your data.

A roof replacement is sold as shingles and delivered as everything underneath them. The covering is the part you can see and the smallest part of whether the job lasts: the decking it is nailed to, the ventilation moving air beneath it, and the flashing at every place the roof meets something else are what decide that. We quote a replacement after walking the roof, because two houses built the same year on the same street routinely need different work once the old layers come off.

What the work involves

What a roof replacement job covers

Tear-off, not an overlay

Laying a second layer over the first hides the decking, traps heat against the new shingles and shortens the life of what you just bought. We strip the roof to the boards so nothing is covered up unseen.

Decking, then everything else

Soft or delaminated decking is replaced before anything goes over it. This is the one moment in twenty years the boards are visible, and covering a bad one costs far more the second time.

Ventilation, balanced

Intake at the eaves and exhaust at the ridge, sized together. A roof with exhaust and no intake pulls air from inside the house instead, which is how a new roof still cooks a plywood deck.

The details that leak

New underlayment, ice-and-water membrane at eaves and valleys, and new flashing at every penetration, sidewall and chimney. Old flashing caulked back into place is the most common leak we get called out to fix.

About the work

What separates a roof that lasts from one that just looks finished

Every replacement looks identical from the kerb on the day it is finished. The differences show up in year six, and all of them were decided while the roof was open.

The deck is the roof

Shingles are a wear layer. The structure doing the actual work is the decking underneath, and it is the only part of the assembly nobody sees between one replacement and the next.

Soft spots around chimneys, in valleys and along the eaves are normal on a roof at the end of its life — those are the places water has been sitting. Replacing a few sheets while the roof is stripped is a small line on the quote. Discovering them at the next replacement means the layer you paid for was never nailed into anything solid.

Ventilation is not an upsell

Air has to enter low and leave high. When it cannot, moisture from inside the house condenses on the underside of the deck through the winter and heat builds under the shingles through the summer, and both shorten the life of a roof that was installed perfectly.

The common fault is exhaust without matching intake — ridge vent added, soffit intake blocked by insulation or never cut. The system then draws its air from the house. Balancing it costs little while the roof is open and is awkward and expensive afterwards.

Flashing is where roofs actually leak

The field of a roof rarely fails first. Leaks start where the roof meets something else: a chimney, a sidewall, a skylight, a valley, a plumbing stack. Those junctions are handled by metal, and metal has a service life of its own.

Reusing old flashing and sealing the gap with caulk is quick, it costs almost nothing, and it is the reason for a large share of the repairs we are called to. Caulk is a maintenance material, not a flashing. New flashing goes on with a new roof.

Choosing the covering, honestly

Architectural asphalt suits most houses and is what most replacements use. Impact-resistant shingles are worth considering where hail is a recurring problem rather than a one-off. Metal costs more up front and lasts substantially longer, and it suits some rooflines far better than others.

A low-slope section — a porch, a dormer, an addition — is a different assembly from the steep roof next to it and must not be shingled as though it were. Where a roof mixes pitches, it gets more than one system, and the quote says so.

What happens next

How a roof replacement job runs

  1. Free inspection

    A thorough inspection — photographs of what we find, and a check of decking, flashing and ventilation rather than pricing off an aerial image.

  2. Written scope and quote

    Materials, tear-off, ventilation and the number, in writing, before anything is ordered.

  3. Tear-off and installation

    Our own crew, on the day we said. Most homes are stripped and re-covered inside a day.

  4. Clean-up and walkthrough

    A magnet run over the property for nails, then a walk of the finished job with you.

Why homeowners choose us

Straightforward from quote to cleanup

Honest, upfront pricing

A clear written quote after a free inspection — no surprises and no pressure afterwards.

One project manager, start to finish

The person who quotes the job runs the job, and is the person you call afterwards.

Backed by industry-leading warranties

Industry-leading warranties, fully licensed and insured, and one team for the whole exterior.

What we install

Materials from manufacturers who stand behind them

We install products with real manufacturer warranties and training behind the installation, because a warranty is only as good as the crew that fits the material.

  • James Hardie
  • GAF
  • Owens Corning
  • CertainTeed
  • ProVia
  • Royal Building Products
  • Norandex
  • WinCore Windows
Good to know

Common questions

How long does a replacement take?

A simple ranch is usually a single day. A larger two-storey with a complex roofline runs two to three. Weather moves the schedule, and we tell you when it does.

Do I need a replacement or a repair?

The free inspection answers it. Age, the condition of the decking and how widespread the damage is decide it, and we will say when a repair is the honest answer.

Can you go over the existing shingles?

We do not. It hides the decking, adds weight, traps heat and shortens the life of the new layer. If somebody has quoted you an overlay, that is why it is cheaper.

Will you replace the flashing too?

Yes. New flashing at penetrations, sidewalls and valleys is part of a replacement rather than an optional line on it.

Is the inspection really free?

Yes. The inspection and the written quote are free and carry no obligation, and nobody will lean on you afterwards.

Who actually does the work?

Coldstream crews in every market we run — and the person who quotes the job stays on the job from the first walk-through to the final cleanup.

What does the warranty cover?

Industry-leading warranties on what we install, alongside whatever the manufacturer warrants on the material itself. Licensed and insured in every market we work in.

Ready for a free, no-pressure estimate?

Tell us what you need and we will take a look. Call (844) 426-8222 or send the form.

Get My Free Estimate →
or call (844) 426-8222
Free Estimate